Owner / Applicant Information
Jason Lange, PE
Eli Lilly and Company
LILLY CORPORATE CENTER
INDIANAPOLIS IN 46285
Phone 3174337336
Email [email protected]
Submitter Information
Edwin Rensink
RTM Consultants Inc
6640 Parkdale Place
Indianapolis IN  
Phone 3173297700
Email [email protected]
Designer Information
Katlyn Dench
Fluor Corporation
100 Fluor Daniel Drive
Greenville SC  
Phone 8648990029
Email [email protected]
Project Information
Lebanon Plant 1 (LP1) Building LP116
1400 W 375 N
LEBANON IN 46052
County BOONE
Project Type New Y Addition   Alteration   Existing   Change of Occupancy  
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 7654828832 Email: [email protected]
Local Fire Official 
7654828832 Email: [email protected]
Phone:


Variance Details
Code Name: 2009 Indiana Electrical Code (675 IAC 17-1.8)
700.12(B)(3)
Conditions: The emergency generator providing backup power for ventilation and alarm systems in the  event of loss of normal power for ventilation system and alarm systems serving H-2 and H-3  areas in Building 16, Peptide 2 will be supplied by natural gas in lieu of an on-site fuel  supply.  Sec. 5004.7, IFC requires standby or emergency power for ventilation and alarm  systems in areas classified as H-2 and H-3 Occupancies. 
               
The Peptide 2 Synthesis/Purification manufacturing building will include four (4) full floor  levels, along with two (2) interstitial partial levels.  The building will include F-1, H-3, H-2, B,  and S-1 Occupancies, and will be of Type IA Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
2
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  The exception to this section in the NEC states that where acceptable to the authority  having jurisdiction, the use of other than on-site fuels shall be permitted where there is a low  probability of a simultaneous failure of both the off-site fuel delivery system and power from  the outside electrical utility company. 
 2. The natural gas supply and electrical utility sources are separate sources and unlikely to  fail simultaneously - no more so than an on-site fuel supply and electric utility  simultaneously.3. The building will be protected throughout with an automatic sprinkler system per IBC/IFC, NFPA 13, and FM Global standards. 

4. On site safety and fire protection features include the Lilly Lebanon Fire Rescue Department with on-site fire station, a site security operations center staffed 24/7, on-site fire protection  water supply consisting of two (2) 540,000-gallon above-ground tanks, two (2) 4,000 gpm fire  pumps, and a 16-inch fire loop around the site.

5.   This variance has been approved previously for three (3) other buildings on this site with  H Occupancy classification; 24-10-35, 24-10-36, and 24-10-58. 
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: Natural gas generators require less maintenance and are considered more reliable in this  case than on-site propane or diesel tanks and piping, and additionally have less  environmental impacts.
Variance Details
Code Name:  Other Code (Not in the list provided)
5004.3.1, 2014 IFC
Conditions: The design for the ventilation system for H-2 and H-3 areas in Building 11, Peptide 2 will  involve re-circulation of air. Based upon process use areas classified as H-2 and H-3  Occupancies, the code requires continuous ventilation and prohibits re-circulation of air  within the building unless alternate designs are approved.  
               
The Peptide 2 Synthesis/Purification manufacturing building will include four (4) full floor  levels, along with two (2) interstitial partial levels.  The building will include F-1, H-3, H-2, B,  and S-1 Occupancies, and will be of Type IA Construction.

The design for the ventilation system for H-2 and H-3 areas in Building 11, Peptide 2 will  involve re-circulation of air. Based upon process use areas classified as H-2 and H-3  Occupancies, the code requires continuous ventilation and prohibits re-circulation of air  within the building unless alternate designs are approved.  
               
The Peptide 2 Synthesis/Purification manufacturing building will include four (4) full floor  levels, along with two (2) interstitial partial levels.  The building will include F-1, H-3, H-2, B,  and S-1 Occupancies, and will be of Type IA Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
2
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  The process areas involving hazardous materials will be provided with an alternate design mechanical ventilation system to maintain flammable liquid vapor accumulation to less than  25% of LEL (lower explosive limit).  LEL detectors will be provided to automatically stop  recirculation of air and activate once through, minimum 100% outside air purge mode of  ventilation to continue to maintain vapor accumulation to less than 25% of LEL. 
 2. The design of the ventilation system with respect to LEL detection activation of the system  will comport with the provisions of Sec. 18.6.3.1, NFPA 30, Flammable and Combustible Liquids Code, for process areas using Class I flammable liquids. NFPA 30 recognizes a performance  based design where LEL detectors are utilized to initiate 100% exhaust for a hazardous  exhaust system.  Sensors are provided for leak detection, liquid leak detection, and  atmospheric leak detection.3. The exhaust system will provide an exhaust rate equal to, or in  excess of the code minimum of 1 cfm per sq ft per the IFC, as well as the minimum 6 air  changes required per Lilly.

4. Similar variances have been approved previously for other Lilly facilities, including 26-04- 16b, 26-04-18, 26-04-17b, 26-04-21, 24-12-04a, 24-12-97, 24-12-03a, 22-12-57a, 22-09-32a,  21-10-30a, 19-10-34a, 16-03-33, 16-03-31 and 06-12-42.

5.   The building will be protected throughout with an automatic sprinkler system per IBC/IFC,  NFPA 13, and FM Global standards. 
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: The hardship is the need to maintain critical operational conditions in process areas, as well  as the operational and maintenance cost to temper 100% outside makeup air for the ventilation system.

Variance Details
Code Name:  Other Code (Not in the list provided)
1008.1.2, 2014 IBC
Conditions: A fire curtain complying with UL 10D will be provided to protect an opening in the 2-hour wall  separating the Purification AFD Suite on Level 1.5, including use as a means of egress door.  The currently adopted 2012 edition of the IBC does not recognize opening protection per UL  10D, with use as a means of egress. 
               
The Peptide 2 Synthesis/Purification manufacturing building will include four (4) full floor  levels, along with two (2) interstitial partial levels.  The building will include F-1, H-3, H-2, B,  and S-1 Occupancies, and will be of Type IA Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.   The 2021 and 2024 IBC recognizes the use of a UL 10D fire curtain, including use in the  means of egress per Sec. 1010.3.3, 2024 IBC. 

2.   The building will be protected throughout with an automatic sprinkler system per NFPA 13  and FM Global requirements.     

3.   Based upon compliance with UL 10D per the 2021 and 2024 editions of the IBC, the use of  the proposed opening protection will not be adverse to safety.

4. Previous variances have been granted to permit the use of UL 10D fire curtains used for  egress, including 25-11-02c, 25-02-07, and 25-02-08.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The use of the proposed overhead coiling fire curtain is necessary based upon limited  available space in the location indicated.
Variance Details
Code Name:  Other Code (Not in the list provided)
2902.3.2, 2014 IBC
Conditions: Available toilet facilities for Mechanical Level 4 will be located on Level 1.  Code requires  facilities to be located one level above or below an occupied floor level.  
               
The Peptide 2 Synthesis/Purification manufacturing building will include four (4) full floor  levels, along with two (2) interstitial partial levels.  The building will include F-1, H-3, H-2, B,  and S-1 Occupancies, and will be of Type IA Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w

1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  Level 4 is a mechanical level and is not normally occupied. There are no permanent work  stations on this level, and it will be occupied only infrequently for maintenance of equipment.   The primary work area for maintenance personnel is in the 1st floor area where the toilet  facility will be provided for their use.  
 2. The toilet facility will be a maximum of approximately 893 feet travel distance from the most  remote point on Level 4 - code permits up to 1,000 feet for an industrial use.3. Based upon  compliance with the overall travel distance limit to the toilet facility, and the lack of permanent  work stations on Level 4, the location of the available toilet facility on the 1st floor will not be  adverse to health or welfare. 

4.   Similar variances were approved previously for two (2) other buildings on this site - 24- 09-56 and 24-09-57. 
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: Location of toilet facilities on Level 4 poses a risk for pest control, and also introduces risk for  use by other employees in the GMP areas on levels below, where strict GMP gowning  protocols are maintained.   

Variance Details
Code Name:  Other Code (Not in the list provided)
716.5, 2014 IBC
Conditions: A fire curtain complying with UL 10D will be provided to protect an opening in the 2-hour wall  separating the Purification AFD Suite on Level 1.5, including use as a means of egress door.  The currently adopted 2012 edition of the IBC does not recognize opening protection per UL  10D. 
               
The Peptide 2 Synthesis/Purification manufacturing building will include four (4) full floor  levels, along with two (2) interstitial partial levels.  The building will include F-1, H-3, H-2, B,  and S-1 Occupancies, and will be of Type IA Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
2
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.   Sec. 716.4, of the 2021 and 2024 IBC recognizes the use of the proposed product  complying with UL 10D.  See attached excerpt from the Significant Changes in the 2021 IBC  publication for more information.

2.   The building will be protected throughout with an automatic sprinkler system per NFPA 13  and FM Global requirements.     
        
3.   Based upon compliance with UL 10D per the 2021 and 2024 editions of the IBC, the use of  the proposed opening protection will not be adverse to safety.

4. Previous variances have been granted to permit the use of UL 10D fire curtains for opening  protection in rated walls, including 25-11-02c, 25-02-07, and 25-02-08.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The use of the proposed overhead coiling fire curtain is necessary based upon limited  available space in the location indicated.