Owner / Applicant Information
Mike Miller
CE Systems
1045 S GLADSTONE AVE
COLUMUS IN 47201
Phone 8123433099
Email [email protected]
Submitter Information
Kyle Ladner
EightTwenty
1825 N Walnut Ave
Oklahoma City IN  
Phone 4052375779
Email [email protected]
Designer Information
Joseph W. Sims
Sim-Durkin Associates Engineering Company
5755 W 74th St
Indianapolis IN  
Phone 3172094035
Email [email protected]
Project Information
CE Systems - Solar Installation
1045 S. Gladstone Ave
Columbus OK 47201
County BARTHOLOMEW
Project Type New   Addition   Alteration Y Existing   Change of Occupancy  
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 8123791535 Email: [email protected]
Local Fire Official 
8123791535 Email: [email protected]
Phone:

Variance Details
Code Name: 2009 Indiana Electrical Code (675 IAC 17-1.8)
110.13
Conditions: Any ballasted system on the roof of a Class 1 structure would not meet that code section.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: This system has been designed and stamped by a structural engineer. The system has been designed to industry standards.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: The alternative to a ballasted system would be significantly more anchors requiring an undue  number of rooftop penetrations into TPO resulting in excessive costs.