Owner / Applicant Information
Matt Gadus
Crawford Door, LP
550 CONGRESSIONAL BOULEVARD
CARMEL IN 46032
Phone 3175802535
Email [email protected]
Submitter Information
Edwin Rensink
RTM Consultants Inc
6640 Parkdale Place
Indianapolis IN  
Phone 3173297700
Email [email protected]
Designer Information
Zachary Benedict
MKM Architecture + Design
435 East Brackenridge Street
Fort Wayne IN  
Phone 2604220783
Email [email protected]
Project Information
Crawford Door Redevelopment Building 2
1701 North Heidelbach Avenue
Evansville IN 47711
County VANDERBURGH
Project Type New Y Addition   Alteration   Existing   Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 8124356325 Email: [email protected]
Local Fire Official 
8124356325 Email: [email protected]
Phone:


Variance Details
Code Name:  Other Code (Not in the list provided)
3004.1, 2014 IBC
Conditions: Elevator hoistway venting will not be provided for the elevator serving the 4-story building.  An elevator with four (4) or more stops requires hoistway venting where the building contains an R Occupancy. 

The building is classified as R-2 Occupancy and Type VA Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  The 2015 International Building Code eliminated the requirement for venting of elevator  hoistways. 
2.  Reference to hoistway venting has been eliminated from the 2010 Edition of the ASME A17.1, Safety Code for Elevators and Escalators.
3.  Elevator hoistway vents, when opened, could potentially draw smoke and heat into the  elevator hoistway.
4.  The building will be protected with an automatic sprinkler system.  Recent studies indicate  that sprinklered buildings do not pose a threat for smoke and heat spread through elevator  shafts.
5. Similar variances have been granted, including 26-07-01d, 26-04-65g, 25-10-50j, 25-08- 28e, 25-08-46d, 25-08-38a, 25-08-65d, 25-06-03g, 25-03-10k, 25-01-05h, 25-01-37d, 24-07- 05d, 24-05-61i, 24-06-04f, 24-03-60g, 23-04-29g, 22-05-19c, 22-04-36d, 22-02-27, 20-02-54f,  20-01-57a, 19-12-63c, 19-10-48c, 19-09-69a, 19-09-68c, 19-08-96c, 19-07-17, 19-06-51b,  19-05-68, 19-04-53, 19-03-54c, 18-08-14c, 18-06-60f, 18-04-28, 18-04-25, 17-09-38b, 17-09- 52, and 17-09-62d. 
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: Venting of elevator hoistways is a vestige of decades-ago theories about smoke spread in  nonsprinklered buildings.  The intent of hoistway venting in previous codes is not clear.  In  addition to potentially drawing smoke into the hoistway from the building, hoistway venting also has a detrimental effect on energy conservation.  In addition to potential adverse affects noted, hardship is the cost to install and maintain elevator vents.