Owner / Applicant Information
Craig Pierson
Blackford County 4-H
310 E. PARK AVE.
HARTFORD CITY IN 46348
Phone 7654990786
Email [email protected]
Submitter Information
Timothy Callas
J & T Consulting, LLC
8220 Rob Lane
Indianapolis IN  
Phone 3178894300
Email [email protected]
Designer Information
Douglas Graham
Graham Engineering Services
28643 CR-50
Nappanee IN  
Phone 5747730415
Email [email protected]
Project Information
Blakford County 4-H
310 E. Park Ave. 
Hartford City IN 46348
County BLACKFORD
Project Type New   Addition   Alteration   Existing Y Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 7653483884 Email: [email protected]
Local Fire Official 
7653483884 Email: [email protected]
Phone:


Variance Details
Code Name:  Other Code (Not in the list provided)
2014 IBC 903.2.1.3
Conditions: The Owner of an existing S-1 Occupancy of 8,640 sf of Type VB construction is requesting to utilize the 4-H building for temporary assembly uses. The primary use of the building will be  a storage building. The majority of the assembly uses are one-day events (see email with  list of events) during the year that the design occupant load would be under 300. The only  multi-day event would be the cattle show during the 4-H fair for 9 days.  Out of the 9 days  there are 5 days where occupants would enter the building for animal shows that last 3-4  hours. The design occupant load for the cattle shows are 100-150 occupants. The  calculated occupant load for the building as an A-3 use would over 300 and would require a  fire suppression system. The variance request is to not require the fire suppression system.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
2
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1. The building is provided with 6 exits and based upon calculated occupant load 3 exits are  required. Design occupant load would only require 2 exits. Refer to drawings for Locations.
2. Exit signs are provided as required by the IBC.
3. Emergency lighting is provided as required by the IBC. 
5. The primary use of the building is a storage building and based upon this use a fire  suppression system is not required. 
6. Four of the six of the one-day events are scheduled for 3-4 hours. See enclosed email with the list of scheduled events. 
7. Building will have a posted maximum occupant load of 299 occupants. 
 
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The owner's undue hardship involves the feasibility of providing a fire suppression system for the building when the primary use is a S-1 Occupancy storage building and assembly use  has a design occupant load not exceeding 299 occupants.