Owner / Applicant Information
Douglas K Marsh
University of Notre Dame
200 FACILITIES BUILDING
NOTRE DAME IN 46556
Phone 5746317900
Email [email protected]
Submitter Information
Edwin L Rensink
RTM Consultants Inc
6640 Parkdale Place
Indianaplis IN  
Phone 3173297700
Email [email protected]
Project Information
Notre Dame Tent Structures - Public Health Emergency
200 Facilities Building
Notre Dame IN 46556
County ST JOSEPH
Project Type New Y Addition   Alteration   Existing   Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 5742359554 Email: [email protected]
Local Fire Official 
Phone: 5742359554 Email: [email protected]

Variance Details
Code Name:  Other Code (Not in the list provided)
3103.5, 2014 IFC
Conditions: Temporary tent structures (14 total) will be erected on campus to provide for COVID 19 testing as well as for overflow student dining and study space for the upcoming school year for a  period of up to 120 days.  The IFC limit per Indiana amendment is 30 days duration (model  code is 180 days).  

Seven (7) tent structures will be located at the COVID Response Unit (CRU) at Gate D at the  football stadium (which are a mix of 2- and 3-sided tents) - see CRU attachment for sizes  and mapped location.  Seven (7) additional tents will be located in strategic locations on  campus for student overflow dining and studying - these tent structures will vary in size  including 30 x 50, 40 x 80, and 85 x 115 and will be 3- and 4-sided structures.  Typical brand  is Losberger De Boer.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1. The tent structures will be erected for a period of less than 180 days - the limit for  temporary tent structures in the International Fire Code.

2. The fabric structures will comply with NFPA 701 flame propagation criteria, as required.  

3. All tent structures will be located as required per Sec. 3103.8.2, IFC, with the exception of  tents at the CRU that are located in the open-air concourse at Gate D of the stadium.  

4. Means of egress will be provided as required per Sec. 3103.12, IFC. 

5. Tent structures will otherwise comply with all requirements of Sec. 3103 and all applicable  requirements of Sec. 3104, IFC.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The variance request is based upon public health and safety needs related to the COVID 19  Public Health Emergency.  The structures are necessary to execute the opening of campus  to students and faculty for the fall semester.