Owner / Applicant Information
Jerry E McClure
JP McClure Enterprises, LLC
5054 NORTH US ROUTE 31
PERU IN 46970
Phone 3176950889
Email [email protected]
Project Information
185 Madison Ave
185 Madison Ave
Peru   46970
County MIAMI
Project Type New   Addition   Alteration   Existing   Change of Occupancy Y
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 7654734881 Email: [email protected]
Local Fire Official 
Phone: 7654734881 Email: [email protected]
Variance Details
Code Name: 12-4-11 Change of Occupancy or Use of Existing Buildings
12-4-11(b)
Conditions: Building is being converted from production space by previous owner(s) to warehouse  space by new owner (JP McClure Enterprises, LLC)
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:

1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: History of building included radio manufacturer for Vietnam War, then  by Nixon Printing to print local newspaper, and American Stationary to print commercial printing products.  Past owner  used space for production of their product(s) and had employees working in this area.  JP  McClure Enterprises, LLC purchased this building in April of 2020 and will be using the  building for warehousing.  JP McClure Enterprises, LLC will have a minimum number of people in the building - from 8 am to 5 pm usually 1 person, from 5 pm to 9 pm an average of 3-5  people.  There are (5) Manway doors for exits and (3) overhead doors for exits.  There are  also (10) Windows that could be broken and used for exits in case of an emergency.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: Monthly Peru Utility Invoice for supporting a Sprinkler System is $132.00/mo.  The current  software to monitor the Sprinkler System is outdated and would cost between $1700.00 -  $4700.00 to update.  Internet would have to be installed to work with updated software, and  then there would be a month fee of $42.00/mo to 5$56.00/mo to monitor the system.  The other  cost include the Annual Sprinkler System Inspection ($150.00/yr), the Five Year Inspection  ($850.00), and then the cost to maintain the system that is estimated at 50 years of age.

Variance Details
Code Name:  Other Code (Not in the list provided)
901.3, 2014 IBC
Conditions: The code requires sprinkler system and as the new owners, JP McClure Enterprises, our  request is to remove the current system as we the building is being converted from  production space by previous owner(s) to warehouse space. Requesting to remove non  functional sprinkler system.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: History of building included radio manufacturer for Vietnam War, then  by Nixon Printing to print local newspaper, and American Stationary to print commercial printing products.  Past owner  used space for production of their product(s) and had employees working in this area.  JP  McClure Enterprises, LLC purchased this building in April of 2020 and will be using the  building for warehousing.  JP McClure Enterprises, LLC will have a minimum number of people in the building - from 8 am to 5 pm usually 1 person, from 5 pm to 9 pm an average of 3-5  people.  There are (5) Manway doors for exits and (3) overhead doors for exits.  There are  also (10) Windows that could be broken and used for exits in case of an emergency.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: Monthly Peru Utility Invoice for supporting a Sprinkler System is $132.00/mo.  The current  software to monitor the Sprinkler System is outdated and would cost between $1700.00 -  $4700.00 to update.  Internet would have to be installed to work with updated software, and  then there would be a month fee of $42.00/mo to 5$56.00/mo to monitor the system.  The other  cost include the Annual Sprinkler System Inspection ($150.00/yr), the Five Year Inspection  ($850.00), and then the cost to maintain the system that is estimated at 50 years of age.