Owner / Applicant Information
Andrew Raih
IU Health Ball Memorial
2401 UNIVERSITY AVE
MUNCIE IN 47303
Phone 7657511368
Email [email protected]
Submitter Information
Derek Holman
RTM Consultants, Inc.
6640 Parkdale Pl Suite J
Indianapolis IN  
Phone 3173297700
Email [email protected]
Designer Information
Louis Huebler
Artekna
321 E New York St
Indianapolis IN  
Phone 3179555090
Email [email protected]
Project Information
IU Ball Memorial 5 North
2401 University Ave
Muncie IN 47303
County DELAWARE
Project Type New   Addition   Alteration Y Existing   Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order?    
Violation Issued by: NA
Local Building Official
Phone: 7657474862 Email: [email protected]
Local Fire Official 
7657474862 Email: [email protected]
Phone:

Variance Details
Code Name:  Other Code (Not in the list provided)
2014 InBC Section 717.6.1
Conditions: A shaft enclosure will not be provided for the duct penetrating the floor assembly between  floors 5 and 6. Code requires any duct penetrations of fire rated floor assemblies in I-2  occupancies be enclosed within a shaft. The duct will be enclosed in a shaft on the 4th floor.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1. A fire damper will be provided where the duct penetrates the floor assembly between floors  5 and 6.
2. The building is provided with a sprinkler system throughout.
3. The design complies with Section 5.3.2 of NFPA 90A-2012 Standard for Installation of HVAC  Systems, as required by CMS and ISDH.
4. Similar variances have been granted in the past on other healthcare facilities (17-06-14,  18-02-04, 18-08-29, 19-05-32).
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
Y
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The hardship is the physical limitations of the layout and the cost to redesign the layout and  reroute the duct. The ductwork penetrates the 5/6 floor assembly, redirects and penetrates  the 4/5 floor assembly at a different location. This occurs in 2 locations. The design, without  the shaft enclosure, complies with the Life Safety Code as required by CMS and ISDH.