Owner / Applicant Information
Paula Maurer
Southwestern Consolidated School District
3406 W 600 S
SHELBYVILLE IN 46176
Phone 3177295746
Email [email protected]
Submitter Information
Edwin Rensink
RTM Consultants Inc
6640 Parkdale Place
Indianaplis IN  
Phone 3173297700
Email [email protected]
Designer Information
Sarah Hempstead
Schmidt Associates
415 Massachusetts Avenue
Indianapolis 0  
Phone 3172636226
Email [email protected]
Project Information
Southwestern Jr-Sr High School Gym Addition
3406 W 600 S
Shelbyville IN 46176
County SHELBY
Project Type New   Addition Y Alteration   Existing   Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 3173926480 Email: [email protected]
Local Fire Official 
3173926480 Email: [email protected]
Phone:


Variance Details
Code Name:  Other Code (Not in the list provided)
903.2.3, 2014 IBC
Conditions: The new gymnasium addition will exceed the allowable 12,000 sq ft for a nonsprinklered E  Occupancy fire area.  Actual area will be 20,372 sq ft, which includes a small area of existing circulation space. 

The project involves construction of a new gymnasium and associated locker rooms and  rest rooms.  The building is classified as E Occupancy, and Type IIB Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1. A total of four (4) exits are provided from the gymnasium space - all directly to the
exterior.

2. Maximum travel distance from within the gymnasium space is 80 feet - code permits up to
200 feet.

3. The addition is within allowable area for Type IIB Construction per Chapter 5, IBC, and will  be separated from the rest of the building with a 2-hour fire wall.

4. A fire alarm system will be provided, as required.

5. A similar variance was granted for the gymnasium addition to Wes-Del School (18-07-22c),  where a public water supply was not available.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
Y
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Y
Facts: The site is not provided with a water supply capable of supplying a sprinkler system.  The  cost to provide an on-site water supply, pump, and sprinkler system is estimated at $215,000.