Owner / Applicant Information
Brad Vogelsmeier
550 E Washington St LLC
460 VIRGINIA AVE
INDIANAPOLIS IN 46203
Phone 3174379940
Email [email protected]
Submitter Information
Edwin Rensink
RTM Consultants Inc
6640 Parkdale Place
Indianaplis IN  
Phone 3173297700
Email [email protected]
Designer Information
Christopher  Texter
KTGY Group Inc.
17911 Von Karman
Irvine CA  
Phone 9498512133
Email [email protected]
Project Information
GRID
550 E Washington St
INDIANAPOLIS IN 46204
County MARION
Project Type New Y Addition   Alteration   Existing   Change of Occupancy  
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 3173275544 Email: [email protected]
Local Fire Official 
3173275544 Email: [email protected]
Phone:

Variance Details
Code Name:  Other Code (Not in the list provided)
1007.2.1, 2014 IBC
Conditions: The elevator serving the 5-story structure will not be provided with generator backup for the  purpose of providing the accessible means of egress requirement for buildings 5 or more  stories in height.  

The project involves construction of three (3) buildings; a 3-level precast concrete parking  garage, a 4-story Type VA residential building, and a 5-story Type IIIA residential structure.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1. The building will be protected with a sprinkler system throughout per NFPA 13. 
2. The elevator will have battery back-up provided in order to permit lowering of the elevator in  the event of loss of power. Additionally, a transfer switch will be provided to permit hookup of a portable generator.
3. Accessible means of egress are not required by the federal Fair Housing Act.
4. The variance as requested has been approved at numerous times before, including (19- 05-68), (18-11-21a), (18-11-20e), (18-10-48c), (18-08-10), (18-02-25), (18-01-25a), (17-09- 46b), (17-07-45d), (17-06-64a), (16-11-39a), (16-08-59e), (16-06-34c), (16-02-47a), (11-01- 43e), (14-10-55), (07-11-12c), (16-12-52b), and (16-12-53a).
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: Hardship is the cost to install and maintain an onsite generator.

Variance Details
Code Name:  Other Code (Not in the list provided)
3004.1, 2014 IBC
Conditions: Hoistway venting will not be provided for the elevators serving the 4-story and 5-story  residential buildings.  An elevator with four (4) or more stops requires hoistway venting  where the building contains an R Occupancy. 

The project involves construction of three (3) buildings; a 3-level precast concrete parking  garage, a 4-story Type VA residential building, and a 5-story Type IIIA residential structure.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  The 2015 International Building Code has eliminated the requirement for venting of elevator  hoistways. 
2.  Reference to hoistway venting has been eliminated from the 2010 Edition of the ASME A17.1, Safety Code for Elevators and Escalators.
3.  Elevator hoistway vents, when opened, could potentially draw smoke and heat into the    elevator hoistway.
4.  The building will be protected with an automatic sprinkler system throughout. Recent  studies indicate that sprinklered buildings do not pose a threat for smoke and heat spread  through elevator shafts.
5. Similar variances have been granted for 4-, 5-, and 6-story buildings, including 19-05-68,  19-04-53, 18-08-14c, 18-06-60f, 18-04-28, 18-04-25, 17-09-38b, 17-09-52, and 17-09-62d.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: Venting of elevator hoistways appears to be a vestige of decades-ago theories about smoke  spread in nonsprinklered buildings. At this point, the intent of hoistway venting in current  codes is not clear. In addition to potentially drawing smoke into the hoistway from the building, hoistway venting also has a detrimental effect on energy conservation. In addition to potential  adverse affects noted, hardship is the cost to install and maintain elevator vents.
Variance Details
Code Name:  Other Code (Not in the list provided)
1007.8, 2014 IBC
Conditions: A 2-way communication system will not be provided at the elevator landing on each floor.  The system is required on each accessible floor that is one story above or below the level of exit discharge.

The project involves construction of three (3) buildings; a 3-level precast concrete parking  garage, a 4-story Type VA residential building, and a 5-story Type IIIA residential structure.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:

DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  Cell phones are widely used for communication, and will provide a more readily available  means of communication for the purpose intended.
2.  This variance has been approved numerous times before, (19-05-68), (18-08-43a), (18- 06-60a), (18-03-32a), (17-10-13), (17-03-82d), (17-06-38d), (16-09-71d), (15-09-73), (17-02- 52a), (17-06-52e), (17-09-62f), and others.
3.   The Type VA building will be protected throughout with an automatic sprinkler system per  NFPA 13R, and the podium building will be protected throughout with a sprinkler system per  NFPA 13.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: Hardship is the cost for a 2-way communication system that would likely never be used.