Owner / Applicant Information
Chip Mehaffey
Loogootee Community Schools
201 BROOKS AVENUE
LOOGOOTEE IN 47553
Phone 8122952595
Email [email protected]
Submitter Information
Dennis Bradshaw
Fire Protection & Code Consultants, LLC
1520 Main Street
Indianapolis IN  
Phone 3174865188
Email [email protected]
Designer Information
Josh Heinz
Myszak + Palmer Architects
903 Broadway Street
Vincennes IN  
Phone 8128860350
Email [email protected]
Project Information
Loogootee Community Schools Renovations - High School
201 Brooks Avenue
Loogootee IN 47553
County MARTIN
Project Type New   Addition   Alteration Y Existing   Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 3174176650 Email: [email protected]
Local Fire Official 
3174176650 Email: [email protected]
Phone:

Variance Details
Code Name:  Other Code (Not in the list provided)
3311.2, 2014 IFC
Conditions: During the renovation of academic wing of an existing High School the existing ceiling will be  removed during the renovation work. It will be advantageous for the project timeline to start  renovating the corridors while school is still in session. The code requires an approved  temporary means of egress to permit the use of the corridors during renovation.  
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
2
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1. All lighting including emergency lighting and exit signs and lights will be operational while  the ceiling is removed.
2. Existing corridor walls do not extend to the bottom side of the roof deck. The renovation  work will include extending the corridor walls to the bottom side of the roof deck separating the rooms from the corridors.
3 The egress path will remain open and will not be blocked equipment while school is in  session.
4. The condition will only exist between March 25 2019 through May 24 2019. 
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The owner's undue hardship is the project timeline and the need to do some of the renovation work while school is still in session.