Owner / Applicant Information
Jim McBee
North Montgomery School Corporation
480 W 500 NORTH
CRAWFORDSVILLE IN 47933
Phone 7653592112
Email [email protected]
Submitter Information
Edwin Rensink
RTM Consultants Inc
6640 Parkdale Place
Indianaplis IN  
Phone 3173297700
Email [email protected]
Designer Information
Sarah Hempstead
Schmidt Associates
415 Massachusetts Avenue
Indianapolis IN  
Phone 3172636226
Email [email protected]
Project Information
Northridge Middle School
482 West 500 N
Crawfordsville IN 47933
County MONTGOMERY
Project Type New   Addition   Alteration Y Existing   Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 7653646493 Email: [email protected]
Local Fire Official 
7653646493 Email: [email protected]
Phone:

Variance Details
Code Name:  Other Code (Not in the list provided)
1018.1, 2014 IBC
Conditions: The Media Center entrance and a Project Room front wall will include nonrated storefront  glazing and doors.  Additionally, two (2) collaborative Project Rooms in the Science/Math  wing will have non-rated operable walls constructed facing the corridor.  New corridor walls  are required to be constructed with 1-hour fire partitions and fire-rated openings.
The project involves very limited interior renovation of the 1985 building.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  The new storefront entrances will be smoke-tight, with self-closing doors.

2.  The operable walls in the Math/Science wing will be in a portion of the building separate  from the main corridor.  The rooms in question have very little combustible fire load or other  type of fire hazard.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The proposed construction is intended to improve students' interactive experience on a very  limited budget.  The cost of fire-rated glazing, etc., for the renovated areas would be cost- prohibitive.