Owner / Applicant Information
Chad Colby
Rossville WWTP
17 W. MAIN STREET
ROSSVILLE IN 46065
Phone 7656501119
Email [email protected]
Submitter Information
Christina Collester
RTM Consultants, Inc.
6640 Parkdale Place
Indianapolis IN  
Phone 3173297700
Email [email protected]
Designer Information
Kyle Gramlich
Bowen Engineering
8802 North Meridian St.
Indianapolis IN  
Phone 3174165298
Email [email protected]
Project Information
Rossville WWTP
17 W. Main Street
Rossville IN 46065
County CLINTON
Project Type New   Addition   Alteration   Existing   Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order?    
Violation Issued by: NA
Local Building Official
Phone: 7653376830 Email: [email protected]
Local Fire Official 
7653376830 Email: [email protected]
Phone:

Variance Details
Code Name:  Other Code (Not in the list provided)
2014 IBC 903.2.5
Conditions: The new storage building will be 300 sq ft in area and will be used to store Sulfur Dioxide (H- 4) and Chlorine (H-3), as well as mechanical and electrical room(F-2) to supply the process equipment involved. 

Automatic sprinkler protection will not be provided for the building.
 
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: Sulfur Dioxide and Chlorine are noncombustible materials. The room will include metering  pumps,
and associated piping. There is no fire hazard involved.
 
Building construction is CMU walls, exterior and interior. The building consists of three rooms  12¿x 7¿8¿, each with one door leading to the outside, the rooms do not connect.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The hardship is the cost of installing and maintaining an automatic sprinkler protection in a  room without a fire hazard. In this case, the sprinkler system would not add any benefit to
safety.