Owner / Applicant Information |
|
|
|
|
|
Brian |
|
Renner |
|
|
|
|
|
Indiana Department of Administration |
|
|
302 W WASHINGTON STREET |
|
|
|
|
ROOM E024 |
|
|
|
|
INDIANAPOLIS |
|
IN |
|
46202 |
|
- |
|
5975 |
|
|
|
|
|
|
|
|
|
Phone |
|
3172326795 |
|
|
|
|
|
Email |
|
[email protected] |
|
|
|
|
|
|
Submitter Information |
|
|
|
|
|
Timothy |
|
Anderson |
|
|
|
|
|
Applied Engineering Services, Inc. |
|
|
|
|
5975 Castle Creek Parkway N Dr |
|
|
Suite 300 |
|
|
|
|
Indianapolis |
|
IN |
|
- |
|
|
|
|
|
|
|
|
|
|
Phone |
|
3178104141 |
|
|
|
|
|
|
Email |
|
[email protected] |
|
|
|
|
|
|
Designer Information |
|
|
|
|
|
Loren |
|
Horen |
|
|
Applied Engineering Services, Inc |
|
|
|
|
5975 Castle Creek Parkway N Dr |
|
|
|
|
Suite 300 |
|
|
|
|
Indianapolis |
|
IN |
|
- |
|
|
|
|
|
|
|
|
|
|
Phone |
|
3178104141 |
|
|
|
|
|
|
Email |
|
[email protected] |
|
|
|
|
|
|
Project Information |
|
|
|
|
|
Fire Pump Replacements at the Indiana Government Center |
|
|
302 W Washington Street |
|
|
|
|
Rm E024 |
|
|
|
|
Indianapolis |
|
IN |
|
46204 |
|
- |
|
|
|
|
|
|
|
|
|
|
|
County |
|
MARION |
|
|
|
|
|
Project Type |
|
New |
|
|
|
Addition |
|
|
|
Alteration |
|
Y |
|
Existing |
|
|
|
Change of Occupancy |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Project Status |
|
U |
|
F=Filed U or Null=Unfiled |
|
|
|
|
|
|
IDHS Issued Correction order? |
|
No |
|
No |
|
|
|
|
|
|
|
Violation Issued by: |
|
NA |
|
|
|
|
|
|
Local Building Official |
|
|
|
|
Phone: |
|
3172322222 |
|
Email: |
|
[email protected] |
|
|
|
|
|
|
|
Local Fire Official |
|
|
3172322222 |
|
Email: |
|
[email protected] |
|
|
Phone: |
|
|
|
|
| | | | | | | | | | | | | | | | | | | | | | |
|
|
Variance Details |
|
|
|
|
|
|
Code Name: |
|
1999 NFPA 20 Installation of Centrifugal Fire Pumps (675 IAC 13-1-10) |
|
|
|
|
|
Chap 9.3.1 |
|
|
|
|
|
Conditions: |
|
Existing normal power electrical connection is not considered reliable. Serviced from a breaker on the building entrance switchgear with another main breaker in front of the fire pump breaker.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED: |
|
|
|
|
|
1=Non-compliance with the rule will not be adverse to the public health, safety or w |
|
|
|
|
2 |
|
|
|
2= Applicant will undertake alternative actions in lieu of compliance with the rule to ensure that granting of the variance will not be adverse to public health, safety, or welfare. Explain why alternative actions would be adequate (be specific).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Facts: |
|
WE are proposing to replace the fire pump and controller/ATS with this project, and make the change to the electrical service for the North building fire pump when the 480V switchgear is replaced. The new ATS will provide a more reliable service for normal and emergency power than currently exists today.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE: |
|
|
|
|
|
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of physical limitations of the construction site or its utility services.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of major operational problems in the use of the building or structure.
|
|
|
Y |
|
|
|
|
|
|
|
|
|
|
|
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of excessive costs of additional or altered construction elements.
|
|
|
|
|
|
|
|
|
|
|
|
Imposition of the rule would prevent the preservation of an architecturally or a historically significant part of the building or structure
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Facts: |
|
A complete electrical outage to the north building will be necessary to complete both projects, and will be in the best interests of the state to complete this construction activity at one time. We anticipate there will be a 2 year time delay between the fire pump replacement project and the 480V switchgear project.
|
|
|
|
|
|
|
|
|
|
|
|
|
| | | | | | | | | | | | | | | | | | | | | | |
|
|
Variance Details |
|
|
|
|
|
|
Code Name: |
|
1999 NFPA 20 Installation of Centrifugal Fire Pumps (675 IAC 13-1-10) |
|
|
|
|
|
Chap 9.3.1 |
|
|
|
|
|
Conditions: |
|
Existing normal power electrical connection is not considered reliable. Serviced from a breaker on the building entrance switchgear with another main breaker in front of the fire pump breaker.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED: |
|
|
|
|
|
1=Non-compliance with the rule will not be adverse to the public health, safety or w |
|
|
|
|
2 |
|
|
|
2= Applicant will undertake alternative actions in lieu of compliance with the rule to ensure that granting of the variance will not be adverse to public health, safety, or welfare. Explain why alternative actions would be adequate (be specific).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Facts: |
|
We are proposing to replace the fire pump and controller/ATS with this project, and make the change to the electrical service for the North building fire pump when the 480V switchgear is replaced. The new ATS will provide a more reliable service for normal and emergency power than currently exists today.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE: |
|
|
|
|
|
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of physical limitations of the construction site or its utility services.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of major operational problems in the use of the building or structure.
|
|
|
Y |
|
|
|
|
|
|
|
|
|
|
|
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of excessive costs of additional or altered construction elements.
|
|
|
|
|
|
|
|
|
|
|
|
Imposition of the rule would prevent the preservation of an architecturally or a historically significant part of the building or structure
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Facts: |
|
A complete electrical outage to the north building will be necessary to complete both projects, and will be in the best interests of the state to complete this construction activity at one time. We anticipate there will be a 2 year time delay between the fire pump replacement project and the 480V switchgear project.
|
|
|
|
|
|
|
|
|
|
|
|
|