Owner / Applicant Information
Tim Foddrill
The Salvation Army
5550 PRAIRIE STONE PARKWAY
HOFFMAN ESTATES IL 60192
Phone 8472942000
Email [email protected]
Submitter Information
Edwin Rensink
RTM Consultants Inc
6640 Parkdale Place
Indianapolis IN  
Phone 3173297700
Email [email protected]
Designer Information
Sarah Kathleen Hempstead
Schmidt Associates
415 Massachusetts Avenue
Indianapolis IN  
Phone 3172636226
Email [email protected]
Project Information
The Salvation Army Headquarters Remodel
6060 Castleway West Drive
INDIANAPOLIS IN 46250
County MARION
Project Type New   Addition   Alteration Y Existing   Change of Occupancy Y
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 3173275544 Email: [email protected]
Local Fire Official 
3173275544 Email: [email protected]
Phone:

Variance Details
Code Name:  Other Code (Not in the list provided)
1018.1, 2014 IBC
Conditions: Egress corridor elements (walls and doors) to be newly constructed within the existing office area of the building will not be fire-rated.  Based upon an occupant load of 30 or more, the  newly created corridor construction is required to be fire-rated.
The proposed project will renovate the 2-story building as offices and other functions for the  Salvation Army Divisional Headquarters. The building is of Type IIB Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
2
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.    The building is provided with a manual fire alarm system.
2.    Corridor smoke detection will be provided - not required by code.
3. The design complies with NFPA 101, Life Safety Code, Sec. 38.3.6, exc. 2, which permits  nonrated corridors in a B Occupancy tenant space where it is a ¿space occupied by a single tenant¿.
4.    Similar variances have been granted for B Occupancy office buildings and tenant  spaces, including 18-02-15, 18-02-29, 17-05-40, 13-03-36a, 13-03-36b, as well as for B  Occupancy medical office tenant spaces including 17-08-09, 17-08-56, 11-06-32, 12-10-28,  and 13-03-45, 16-03-23, 16-06-56, 16-06-61, 15-01-33, 15-06-54, 16-07-11, and 16-07-27.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The estimated cost for the new corridor elements to be constructed as rated elements is  $30,000.  Most of the corridor is existing to remain.  Providing sporadic new rated corridor  elements would have limited benefit given the cost.