Owner / Applicant Information
Dave Dazey
EVAPAR
9000 N KENTUCKY AVE
EVANSVILLE IN 47725
Phone 8128679900
Email [email protected]
Submitter Information
Roger Lehman
RLehman Consulting
1220 N Red Bank Rd
Evansville IN  
Phone 8125890331
Email [email protected]
Designer Information
  xxx
 
 
     
Phone  
Email  
Project Information
Office Mezzanine Expansion
9000 N Kentucky Ave
Evansville IN 47725
County VANDERBURGH
Project Type New   Addition Y Alteration   Existing   Change of Occupancy  
Project Status U F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 8124367868 Email: [email protected]
Local Fire Official 
8124367868 Email: [email protected]
Phone:

Variance Details
Code Name:  
 
Conditions:  
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
 
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts:  
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts:  

Variance Details
Code Name: 12-4-12 Existing Buildings; Additions or Alterations
2014 IBC Table 706.4
Conditions: Existing Type II F1/S1/B Building is over allowable area and the section of the building  containing the 2nd floor office expansion area is only separated from rest of the S1/F1  building by 2 hr. fire barrier in lieu of 3 hr. fire wall.
F1/S1 areas are used to assemble new electric generators to customers specifications.  90% of components are steel or iron.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: F1 and S1 Areas are very close to F2/S2 requirements but a small amount of plastic parts and a small supply of wet cell storage batteries prevent classification as F2/S2 which would not be over area and would be able to meet unseparated use requirements.
Motor testing room is also separated by 2 hr fire barrier.
Area is staffed by trained workers familiar with exiting and conditions of space.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: constructing a self supporting wall in this area would be very difficult as the building is in use  and cannot be shut down.
Project is only considered an addition because an existing 1500 sq ft office mezzanine area  is being expanded to add 3-4 more offices.
Adding free standing wall and parapet would cost about 25% of the whole project budget.