2010 NFPA 13 Installation of Sprinkler Systems (675 IAC 28-1-5) |
|
|
|
|
|
8.3.1.1 |
|
|
|
|
|
Conditions: |
|
The listing for the sprinkler requires baffles to be installed inside the concrete tee, to create pockets with a maximum permitted length of 32 feet.
|
|
|
|
|
|
|
|
|
|
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED: |
|
|
|
|
1=Non-compliance with the rule will not be adverse to the public health, safety or w |
|
|
|
|
1 |
|
|
|
2= Applicant will undertake alternative actions in lieu of compliance with the rule to ensure that granting of the variance will not be adverse to public health, safety, or welfare. Explain why alternative actions would be adequate (be specific).
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Facts: |
|
The purpose of the variance request is based on the testing criteria for obtaining a listing for the fire sprinkler. In order for the sprinkler in this case to be listed, it had to be fire tested in a test facility utilizing the type of construction that it was being listed for. For this listing, the test involved concrete ¿T¿ construction and obtaining acceptance for the sprinkler to preform properly under fire conditions when located under this type of construction. The test facility itself was limited to the length of 32 feet. Therefore, a limitation was added to the listing of the sprinkler to require a baffle to catch heat inside the concrete T at 32 foot distances. We maintain that sprinklers for this project will be spaced on along the 32 ft length and on both sides where a baffle would be installed, thus eliminating the need for a baffle. Essentially, installing a baffle requirement is due to the size of the testing facility and limitations of the concrete T¿s are based on the size of the test facility.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE: |
|
|
|
|
|
|
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of physical limitations of the construction site or its utility services.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of major operational problems in the use of the building or structure.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Y |
|
Imposition of the rule would result in an undue hardship (unusual difficulty) because of excessive costs of additional or altered construction elements.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Imposition of the rule would prevent the preservation of an architecturally or a historically significant part of the building or structure
|
|
|
|
|
|
|
|
|
|
|
Facts: |
|