Owner / Applicant Information
Brandon Bogan
Flaherty & Collins Properties
ONE INDIANA SQUARE STE 3000
INDIANAPOLIS IN 46204
Phone 3178169300
Email [email protected]
Submitter Information
MARK RIFFEY
RYAN FIREPROTECTION, INC.
9740 EAST 148TH STREET
NOBLESVILLE IN  
Phone 3175572556
Email [email protected]
Designer Information
John Gallagher
Eppstein  Uhen Architects
333 E Chicago St
Milwaukee WI  
Phone 4142918151
Email [email protected]
Project Information
The Mill at Ironworks Plaza
209 W  Front St
MISHAWAKA IN 00000
County ST JOSEPH
Project Type New   Addition   Alteration   Existing   Change of Occupancy  
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 5742581607 Email: [email protected]
Local Fire Official 
5742581607 Email: [email protected]
Phone:

Variance Details
Code Name: 2010 NFPA 13 Installation of Sprinkler Systems (675 IAC 28-1-5)
8.3.1.1
Conditions: The listing for the sprinkler requires baffles to be installed inside the concrete tee, to create  pockets with a maximum permitted length of 32 feet.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: The purpose of the variance request is based on the testing criteria for obtaining a listing for  the fire sprinkler.  In order for the sprinkler in this case to be listed, it had to be fire tested in a  test facility utilizing the type of construction that it was being listed for.  For this listing, the test  involved concrete ¿T¿ construction and obtaining acceptance for the sprinkler to preform  properly under fire conditions when located under this type of construction. The test facility  itself was limited to the length of 32 feet.  Therefore, a limitation was added to the listing of the  sprinkler to require a baffle to catch heat inside the concrete T at 32 foot distances.  We  maintain that sprinklers for this project will be spaced on along the 32 ft length and on both  sides where a baffle would be installed, thus eliminating the need for a baffle.  Essentially,  installing a baffle requirement is due to the size of the testing facility and limitations of the  concrete T¿s are based on the size of the test facility.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: The requirement for installation of baffles is based upon the size of the testing facility.  Providing baffles as well as sprinkler coverage will not provide any additional benefit, only  added cost.