Owner / Applicant Information
Lance Richards
North Harrison Community School Corporation
1260 HIHGWAY 64 NW
RAMSEY IN 47166
Phone 8123472870
Email [email protected]
Submitter Information
Edwin Rensink
RTM Consultants Inc
6640 Parkdale Place
Indianapolis IN  
Phone 3173277700
Email [email protected]
Designer Information
Hal  Kovert
Kovert Hawkins Architects
630 Walnut Street
Jeffersonville IN  
Phone 8122829554
Email [email protected]
Project Information
North Harrison MS-Physical Education Addition
1180 Highway 64 NW
Ramsey IN 47166
County HARRISON
Project Type New   Addition Y Alteration   Existing   Change of Occupancy  
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 8127388927 Email: [email protected]
Local Fire Official 
8127388927 Email: [email protected]
Phone:

Variance Details
Code Name: 2010 NFPA 13 Installation of Sprinkler Systems (675 IAC 28-1-5)
8.2.1
Conditions: The existing sprinkler riser serving the physical education addition will have a total coverage  area of 55,372 sq ft.  Code limit is 52,000 sq ft for a light hazard occupancy system.
The project involves construction of a physical education addition of 23,548 sq ft to the  existing middle school.  A previous phase recently completed provided a sprinkler system  throughout the existing building.  There are two (2) separate risers provided in the existing  building.  The building is classified as E Occupancy and Type IIB Construction.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  The existing riser and system piping is designed to deliver the required flow and pressure  to the most remote point of the addition, as required.

2.  The sprinkler system will comply with all requirements based upon the demand for the  hydraulically most remote area, as required.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: The cost to provide a 3rd riser at this point is estimated at $92,000.