Owner / Applicant Information
Glen Wagler
Quality Woodcraft
9921 N 1070 E
ODON IN 47562
Phone 8126362400
Email [email protected]
Submitter Information
Daniel Tarr
DB Tarr & Co
8728 W. Co. Rd. 175 S.
French Lick IN  
Phone 8122780060
Email [email protected]
Designer Information
Daniel B. Tarr
D.B. Tarr & Co.
8728 W. Co. Rd. 175 S.
French Lick IN  
Phone 8122780060
Email [email protected]
Project Information
Quality Woodcraft
9921 N 1070 E
Odon IN 47562
County DAVIESS
Project Type New Y Addition   Alteration   Existing   Change of Occupancy  
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order? No yes
Violation Issued by: SBC
Local Building Official
Phone: 3174173698 Email: [email protected]
Local Fire Official 
3174173698 Email: [email protected]
Phone:


Variance Details
Code Name: 2014 IBC
903.2.4(4)
Conditions: The structure is an F-1 occupancy and type V-B construction. The building is 1 story (plus a mezzanine) with a total fire area of 9,730 sq. ft. (including the mezzanine). The code requires  a sprinkler system to be provided throughout all Group F-1 occupancy fire areas that contain woodworking operations in excess 2,500 sq. ft. The building is located in a rural area were  the rural water company cannot provide adequate volume or pressure for a code compliant  sprinkler system.. Subdividing the building into into 2500 sq. ft. areas with fire barriers is not  practical for the manufacturing process. 
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
2
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: The owner has proposed additional exits and other measures to ensure that the building will  not be adverse to the public health, safety or welfare.

The facility will be provided with a dust collection system that will prevent the release of finely  divided combustible waste or use of finely divided combustible materials. The dust collection  system will be designed and installed per NFPA 664, 2012 Edition that includes exterior silo  with collection manifold with individual connections to each cutting and sanding machine. The dust collection system will immediately evacuate the finely divided combustible waste from the  building to exterior silo mitigating potential for risk of fire and/or explosion.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
Y
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
 
  Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: In order to be able to install a code compliant sprinkler system, the owner would have to  upgrade the rural water company's water distribution system. This would include running  miles of new pipe and potentially installing booster station(s). The price of this system  upgrade would be more than triple the price of the building.

Therefore, the owner is proposing the installation of additional exits and the NFPA 664 dust  collection system.