Owner / Applicant Information
David Imel
Rolls-Royce North America
450 S. MERIDIAN ST.
INDIANAPOLIS IN 46225
Phone 3172302000
Email [email protected]
Submitter Information
David Cook, RA
Ralph Gerdes Consultants, LLC
5510 South East Street
Indianapolis IN  
Phone 3177877375
Email [email protected]
Designer Information
Mark Reed Gustetter
BRPH Architects & Engineers, Inc.
5700 North Harbor City Blvd.
Melbourne FL  
Phone 3217513003
Email [email protected]
Project Information
Rolls-Royce Plant 5 Assembly & Test
2355 S. Tibbs Avenue
INDIANAPOLIS IN 46241
County MARION
Project Type New   Addition   Alteration   Existing Y Change of Occupancy  
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order? No No
Violation Issued by: NA
Local Building Official
Phone: 3173275544 Email: [email protected]
Local Fire Official 
3173275544 Email: [email protected]
Phone:


Variance Details
Code Name:  Other Code (Not in the list provided)
InBC - 2014 910.2.1
Conditions: n existing factory (c1942), with subsequent additions and razing of other parts of the existing  facility, is undergoing extensive remodeling and retooling for a major engine manufacturing  company will have the existing smoke and heat vents removed from the engine assembly   buildings roofs.  The use group of the engine assembly building is remaining an F-1 by  today's code definition.  Code requires F-1 use groups over 50,000 sq ft of undivided space  to have Smoke and Heat vents or a mechanical exhaust system.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
2
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1.  The engine assembly building will be protected with a new ordinary hazard sprinkler  system per NFPA 13.  
2.  Five (5) new air handling units (AHU) with Spill-Air Hoods for full exhaust are being installed with four (4) at 20,000 cfm, and one (1) at 11,200 a total of 91,200 of total exhaust available for  the entire area that would be require to maintain Smoke and Heat Venting.
3.  The AHU will be wired for automatic shut down upon activation of the sprinkler system,  HVAC duct detectors, or fire alarm system.  All units will then be controlled, in two (2) separate zones, by the fire department at a control panel in the entry lobby of the Office and Dock  building, per the request of the Local Fire Department.  
4.  The smoke exhaust system will have normal wiring and ratings. This is a post incident  convenience system, without high temperature wiring, and fans
5.  Smoke and egress modeling indicates that the smoke layer in an uncontrolled fire situation will be approximately 25.1 ft above the floor at the time all occupants are out of the building,  giving significant time for total evacuation of the building.
6. Two (2) identical variances for Rolls Royce Projects 5AB (17-04-81) and 8M (17-04-80)  were approved.
 
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
Y
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
 
Facts: The owner's undue hardship involves the fact that all the existing smoke and heat vents are  leaking, are not sized to today's requirements and may not even work.  The code at the time  did not require smoke and heat venting, and thus why they are not spaced properly.  The cost to replace the smoke and heat venting with a code compliant smoke removal system is a cost  hardship.

Studies show that smoke and heat vents should not be combined with sprinkler systems due  to the potential of too many sprinkler heads going off over areas that are not over the fire as  heat is drawing to an open smoke and heat vent.  Finally, the engine assembly operation most resembles a F-2 use with extremely limited, if any at all, of combustibles.