Owner / Applicant Information
Jed Momot
NP Meridian LLC
5015 NW CANAL ST STE 200
RIVERSIDE IN 64150
Phone 8163842293
Email [email protected]
Submitter Information
John Mercer
ARCO National Construction
900 n rock hill rd
St Loius IN  
Phone 3146148840
Email [email protected]
Designer Information
Donald Rosemann
Rosemann and Associates P C
1526 Grand Blvd
Kansas City MO  
Phone 8164721448
Email [email protected]
Project Information
Stonecrest At Meridian
8549 N Meridian St
Indianapolis MO 46260
County MARION
Project Type New Y Addition   Alteration   Existing   Change of Occupancy  
Project Status F F=Filed U or Null=Unfiled
IDHS Issued Correction order?    
Violation Issued by: NA
Local Building Official
Phone: 3174037004 Email: [email protected]
Local Fire Official 
3174037004 Email: [email protected]
Phone:

Variance Details
Code Name:  Other Code (Not in the list provided)
1007.8, 2014 IBC
Conditions: A 2-way communication system will not be provided at the elevator landing on each floor.   The system is required on each accessible floor that is one story above or below the level of exit discharge, apparently without regard as to whether or not the elevator is a required  accessible means of egress.

The project scope is construction of a new 2-story & partial 1-story Type VA Assisted Living  & Memory Care facility.
DEMONSTRATION THAT PUBLIC HEALTH, SAFETY, AND WELFARE ARE PROTECTED:
1=Non-compliance with the rule will not be adverse to the public health, safety or w
1
2= Applicant will undertake alternative actions in lieu of compliance with the rule to  ensure that granting of the variance will not be adverse to public health, safety, or  welfare.  Explain why alternative actions would be adequate (be specific).
Facts: 1. Cell phones are widely used for communication, and will provide a more readily available  means of communication for the purpose intended.
2. This variance has been approved numerous times before, (17-03-82d), (17-06-38d), (16- 09-71d), (15-09-73), (17-02-52a), (17-06-52e), and others.
3.      It is unlikely that residents of the facility would know how to effectively use the means of  the communication due to the nature of the facility.
DEMONSTRATION OF UNDUE HARDSHIP OR HISTORICALLY SIGNIFICANT STRUCTURE:
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of physical limitations of the construction site or its utility services.
 
Imposition of the rule would result in an undue hardship (unusual difficulty)  because of major operational problems in the use of the building or structure.
 
Y Imposition of the rule would result in an undue hardship (unusual difficulty)  because of excessive costs of additional or altered construction elements.
  Imposition of the rule would prevent the preservation of an  architecturally or a historically significant part of the building or structure
Facts: Hardship is the cost for a 2-way communication system that would likely never be used.