DHS

Indiana Department of Homeland Security / Fire and Building Safety Division

2020-21 version

 

Update Inspection

[Open Report in Chrome Browser]
[back to inspection list]
[view and Print Report (No Notes)]
[view and Print Report with Notes]
__________________________
Record Created Date: 11/21/2016
* facility ID:
* facility name:
* facility street number:
* facility street prefix:
* facility street name:
* facility street suffix:
facility address2:
* facility city:
* facility county:
facility state: IN
* facility zip:
* facility contact:
* facility telephone:
* facility Email:
Foundation/Footer status:
Concrete Slab status:
Framing Status:
Plumbing status:
Mechanical status:
Electrical status:
Energy status:
Sprinkler status:
alarm status:
sensitivity current :
Interior status:
Pool status:
Egress status:
Suppression status:
temporary indoor stage:
temporary outdoor stage:
outdoor stage equipment :
canopy:
tent :
ust installation:
ust removal:
project Type(select ll that apply): New: Addition: Remodel: Occ.Change: Existing:
inspection Category:
inspection type:
inspection status:
inspection Date: (mm/dd/yyyy)Pick a date
violation to be corrected by Date: (mm/dd/yyyy)Pick a date
* inspector:
notes:
Facility Match?: (Type in Facility Matched, when you match a complaint inspection with facility.)
[view & print annual permit] [Email permit]
print order code description remarks violation to be corrected by date violation complied date

2014 Edition IFC  675 IAC 22-2.5 
904.6 Dry-chemical systems. Dry-chemical extinguishing systems shall be installed, maintained, periodically inspected and tested in accordance with NFPA 17 and their listing. 904.6.1 System test. Systems shall be inspected and tested for proper operation at six-month intervals. Tests shall include a check of the detection system, alarms and releasing devices, including manual stations and other associated equipment. Extinguishing system units shall be weighed, and the required amount of agent verified. Stored pressure type units shall be checked for the required pressure. The cartridge of cartridge-operated units shall be weighed and replaced at intervals indicated by the manufacturer 
System is past due for inspection.