DHS

Indiana Department of Homeland Security / Fire and Building Safety Division

2020-21 version

 

Update Inspection

[Open Report in Chrome Browser]
[back to inspection list]
[view and Print Report (No Notes)]
[view and Print Report with Notes]
__________________________
Record Created Date: 01/09/2012
* facility ID:
* facility name:
* facility street number:
* facility street prefix:
* facility street name:
* facility street suffix:
facility address2:
* facility city:
* facility county:
facility state: IN
* facility zip:
* facility contact:
* facility telephone:
* facility Email:
Foundation/Footer status:
Concrete Slab status:
Framing Status:
Plumbing status:
Mechanical status:
Electrical status:
Energy status:
Sprinkler status:
alarm status:
sensitivity current :
Interior status:
Pool status:
Egress status:
Suppression status:
temporary indoor stage:
temporary outdoor stage:
outdoor stage equipment :
canopy:
tent :
ust installation:
ust removal:
project Type(select ll that apply): New: Addition: Remodel: Occ.Change: Existing:
inspection Category:
inspection type:
inspection status:
inspection Date: (mm/dd/yyyy)Pick a date
violation to be corrected by Date: (mm/dd/yyyy)Pick a date
* inspector:
notes:
Facility Match?: (Type in Facility Matched, when you match a complaint inspection with facility.)
[view & print annual permit] [Email permit]
print order code description remarks violation to be corrected by date violation complied date

675 IAC 12-4-12 (f) (eff March 1, 1988) 
No addition to a building or structure plus the existing building or structure shall exceed the height, number of stories and area allowed by the rules of the commission for a new building or structure. 
The addition to the existing Shanklin Theatre/Hyde Hall (referred to as the May Studio addition) resulted in non-compliance based on allowable area; the total area for the existing building and the new addition exceeded allowable area for the construction type according to the code of record.  
02/09/2012